Skip to main content
  • About
  • Calendar
  • Contact
The Engineering Equipment and Materials Users Association
Login
  • Publications
  • Events
    • EEMUA Conference 2025 Gallery
  • Membership
    • Corporate Membership
    • Associate Company Scheme
    • Testimonials
    • Members and Associates
    • Student Champion Scheme
  • Training
    • All Training Courses
    • Leadership
    • Storage Tanks
    • Exams
    • Mechanical Integrity
    • Subsea Engineering
    • E-Learning
  • Login/Register
  • Basket
  • About
  • Calendar
  • Contact

E

A B C D E F G H I J K L M N O P Q R S T U V W X Y Z

Earth
Earth Electrode
Earth Electrode Resistance
Earth Fault Loop Impedance
Earthing Conductor PE
Earthing Conductor PEN
Earthing Lug
EEMUA
Edge Settlement
Electrical Equipment
Electrical Installation
Electrical/Electronic/Programmable
Electric Welded Pipe
Embankment
Emergency Drain
Emergency Shutdown System
Empirical Property
End-user
Engineering/Design Body
Equipment Protection Level (EPL)
Equipotential Bonding
Equipotential Bonding Conductor
Equivalent Continuous Sound Level
Error (IEV 191-05-24)
Essential Safety Requirements (ESRs) (Annex I)
Estimated Average / Estimated Mean
Estimated Time Between Failures without Maintenance (ETBF)
EUC
European Approval for Materials (EAM) (Art. 1, 2.9 & Art. 11)
Event
Executable
Expanding Gate Valve
Expanding Plug Valve
Experienced Inspector
Explosion-pressure-resistant
Explosive Dust Atmosphere
Explosive Gas Atmosphere
Explosive Limits
Exposed Conductive Part
Extraneous Conductive Part
  • Current issues
  • Accessibility
  • Members and Associates
  • Ask EEMUA
  • Cookies
  • Copyright & Intellectual Property Rights
  • Privacy policy
  • Site map
  • Terms and conditions
Listen to our podcast Visit our LinkedIn page

© 2025 Engineering Equipment and Materials Users Association